Skip to content

Senior Project Manager, Utility Electrical, Vernon, TX – Data Center Construction

WwprosolutionsVernon, TX

First seen Sep 30 · open 52 days · posted onceNo pay listed

HirQ verdict

58/100 · Fair. Based on age, reposts, pay, the company's hiring and ghost signals.

Low ghost risk
True age
52 days
Reposts
Posted once

See the evidence behind this score.

Pro shows each part of the score, the reasons, the pay percentile and the listing history.

HirQ's ghost-risk estimate and company labels are automated opinions based on what we observe on employers' public job boards: how long a listing has been open, whether it was re-listed, wording in the description, and how often roles on that board close. They are not statements about an employer's intent, and a high-risk listing can still be a real opening. Figures are as of the date shown. How we measure

At a glance

Pay
No pay listed
Level
Senior
Experience
12+ years
Type
Full Time
Team
Project Management
Work setup
On-site

“Vernon, TX”

Pay vs market

Employer-posted ranges for Project & Program Management roles in TX in the last 12 months (87 postings).

$105k
25th pct/yr
$130k
Median/yr
$176k
75th pct/yr
$82k · 10th90th · $208k

This job: No pay listed

Wwprosolutions hiring

Company page
Hiring fastHiring63· FairManufacturing & Industrial
Open roles
58
New in 30 days
20
Closed in 30 days
2
Hiring trend, 13 weeksPro
Follow-through: ••%Pro

About the role

From Wwprosolutions's careers page, checked Nov 22

WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.

WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean construction, collaborative contracting, and execution approaches to enable breakthroughs in performance.
WWPS is hiring a Senior Project Manager, Utility Electrical, to lead the utility electrical and high voltage substation scope for a large-scale data center project in Vernon, TX. This is a full time, 100% onsite role.
This is a high visibility owner’s representative role focused on the Futility electrical package, including the high voltage utility interconnection, substation, protection and controls, energization, and interface to the data center electrical distribution system. You will own execution across design, construction, commissioning, and turnover.
Wherever you are based, we provide full relocation or travel support including per diem, ensuring a smooth transition so you can hit the ground running from day one.
What Makes This Role Different
Owner’s representative leadership for the utility electrical and high voltage substation package
Direct coordination across the serving utility, substation contractors, engineering teams, vendors, commissioning teams, and data center stakeholders
Technical scope covering utility interconnection, transformers, breakers, switchyard equipment, protection and controls, metering, SCADA, grounding, and incoming power distribution
Ownership of energization readiness, switching coordination, testing, commissioning, and turnover of mission critical power infrastructure
A specialized role for a project leader who understands utility and substation construction, not only building level MEP electrical work
What You Will Do
Lead full lifecycle delivery of the utility electrical scope from design coordination and procurement through construction, energization, commissioning, and turnover
Serve as the primary owner’s representative interface with the serving utility, electrical EPC or contractor, design engineers, equipment vendors, commissioning teams, and site leadership
Manage high voltage substation and switchyard scope including transformers, breakers, disconnect switches, bus, instrument transformers, control buildings, station service, grounding systems, cable systems, and associated civil interfaces
Drive utility interconnection milestones, design approvals, long lead equipment procurement, outage and switching coordination, and required energization dates
Review and challenge electrical single line diagrams, substation layouts, equipment submittals, protection and control schemes, relay coordination, grounding studies, and construction packages
Oversee protection and controls, relaying, SCADA, telecom, revenue or utility metering, and the interfaces between utility systems and the data center electrical distribution network
Coordinate installation and testing of high voltage and medium voltage cables, terminations, transformers, switchgear, breakers, grounding, and related electrical infrastructure
Lead quality and commissioning readiness including factory acceptance testing, field acceptance testing, relay testing, electrical testing, punch resolution, and energization documentation
Develop and manage safe energization, switching, lockout tagout, outage, and turnover plans in alignment with utility requirements, NEC, NESC, NFPA 70E, OSHA, and project standards
Control schedule, cost, risk, change management, contractor performance, and interface issues for the utility electrical workstream
Identify constructability, sequencing, access, equipment delivery, and cross discipline interface risks early and drive them to resolution
What You Bring
12 to 20+ years of construction project management experience with significant electrical infrastructure responsibility
Strong experience delivering utility substations, high voltage electrical infrastructure, utility interconnections, transmission or distribution projects, or comparable mission critical power systems
Hands on knowledge of substation construction, power transformers, high voltage and medium voltage switchgear, breakers, protection and controls, relays, grounding, cable systems, and energization
Ability to read and manage execution from single line diagrams, electrical specifications, protection and control drawings, substation layouts, and commissioning procedures
Proven ability to lead contractors, engineers, utilities, vendors, commissioning teams, and multidisciplinary project stakeholders
Experience with electrical QA and QC, testing, commissioning, turnover, energization planning, and safe work practices around energized systems
Proficiency with project controls and construction management tools such as Procore, Primavera P6, or MS Project
Preferred Background
Hyperscale data center or mission critical utility electrical experience strongly preferred
Direct, high voltage substation, utility interconnect, switchyard, or owner’s representative electrical package experience is highly relevant
Background with an electric utility, substation EPC, electrical contractor, engineering firm, commissioning provider, or large industrial power project is highly transferable
Bachelor’s degree in electrical engineering, construction management, engineering, or a related field. PE, PMP, or electrical commissioning credentials are a plus
Compensation and Benefits
Highly competitive compensation aligned with senior level utility electrical and project leadership experience
Per diem and travel support where applicable
Medical, dental, and vision coverage
Life insurance and disability coverage
Company matched retirement plan
Paid time off and paid holidays
Why Top Candidates Choose WWPS
Lead one of the most technically critical workstreams on a large-scale data center program
Operate in a true owner’s representative capacity with direct influence on utility power delivery, energization, and project outcomes
Work at the intersection of utility infrastructure, high voltage substations, mission critical electrical systems, and data center construction
Join a project environment where electrical reliability, schedule certainty, and safe energization are central to success
Be part of a company that is scaling and investing in specialized technical project leadership
Bottom Line
If you are a Senior Project Manager with deep utility electrical or substation experience who can lead a  power delivery package from design through energization and turnover, this role offers direct ownership of one of the most critical scopes on a major data center project in Vernon, Texas.

Skills mentioned

  • Project Management
  • Electrical Engineering
  • Quality Assurance
Apply on Wwprosolutions's siteOpens Wwprosolutions's own application page.

Similar jobs

Same role or field, nearby or remote, ranked by HirQ score.

More at Wwprosolutions

All roles

Keep exploring

Senior Project Manager, Utility Electrical, Vernon, TX – Data Center Construction

No pay listed · HirQ 58

Apply