Electrical Designer - Solar
Atwell, LLCRemoteRemote
Invinity1219 Adanac StHybrid
52/100 · Fair. Based on age, reposts, pay, the company's hiring and ghost signals.
See the evidence behind this score.
Pro shows each part of the score, the reasons, the pay percentile and the listing history.
HirQ's ghost-risk estimate and company labels are automated opinions based on what we observe on employers' public job boards: how long a listing has been open, whether it was re-listed, wording in the description, and how often roles on that board close. They are not statements about an employer's intent, and a high-risk listing can still be a real opening. Figures are as of the date shown. How we measure
“1219 Adanac St, Vancouver BC”
From Invinity's careers page, checked Nov 21
We are at the beginning of a global energy transformation of a scale not seen in generations. A future low-cost, low-carbon electric grid, serving a world that electrifies everything, is within our reach.
The last remaining gap is breaking the link between electricity supply and demand. The lowest-cost, most sustainable sources of energy today come from intermittent renewable generation; but our homes, businesses and industries need electricity at the flick of a switch.
That gap can be closed by energy storage: Devices that store electricity when it is plentiful, then provide power back to the grid when it is needed. Solutions, including ones using lithium-ion batteries, are being deployed in massive numbers to start filling this gap. But so far, none of those solutions have proven the ability to deliver power any time, anywhere, over decades of service: The level of reliability we’ve come to expect, and that the future grid will need.
This is the biggest challenge in energy today. Invinity is at the forefront of finding a solution. And we need you to help us deliver it.
Developed, manufactured and delivered by our teams in Canada and the UK, Invinity’s vanadium flow batteries (or “VFBs”) can be installed anywhere and consistently deliver electricity as needed over a service life exceeding 30 years. Moreover, Invinity’s VFBs are highly recyclable, don’t rely on rare or conflict minerals, and won’t catch fire.
Invinity is a global VFB leader, with over 190 megawatt-hours of its batteries operational or in construction for over 82 projects across 15 countries - more than any other emerging energy storage provider. We’ve deployed the largest flow battery systems in the U.S., Canada, Australia, and the UK. Along the way we’ve earned financial support from the UK Infrastructure Bank, the U.S. Department of Energy, and some of the world’s leading institutional investors.
The realization of these battery systems requires electrical and electronics design and validation activities: from clean sheet concept to detailed design of control electronics, electrical systems, component selection, test design and execution, regulatory compliance, production release and ongoing product support. These activities are performed by the electrical and electronics team, of which this role is a part.
This is a senior role with responsibility to lead the specification and design of the electrical systems within Invinity’s energy storage products. This role will include a shared responsibility in future product definition, product safety and project management.
Same role or field, nearby or remote, ranked by HirQ score.
Atwell, LLCRemoteRemote
jobgetherUSRemote
CERNGeneva, GENEVA, CH
Valar AtomicsTorrance, California, United States
MeadeRemoteRemote
Valar AtomicsTorrance, California, United States
Invinity1219 Adanac St, Vancouver BCHybrid
InvinityUnit 1, Easter Inch Industrial Estate, Bathgate, West LothianHybrid
Invinity1219 Adanac St, Vancouver BC
Senior Electrical Designer
No pay listed · HirQ 52