Skip to content

Senior Construction Manager - Data Center Construction

CoreWeaveWest Chicago, IL

First seen Sep 21 · open 62 days · posted once$143k–$210k/yr

HirQ verdict

66/100 · Strong. Based on age, reposts, pay, the company's hiring and ghost signals.

Low ghost risk
True age
62 days
Reposts
Posted once

See the evidence behind this score.

Pro shows each part of the score, the reasons, the pay percentile and the listing history.

HirQ's ghost-risk estimate and company labels are automated opinions based on what we observe on employers' public job boards: how long a listing has been open, whether it was re-listed, wording in the description, and how often roles on that board close. They are not statements about an employer's intent, and a high-risk listing can still be a real opening. Figures are as of the date shown. How we measure

At a glance

Pay
$143k–$210k/yr
Level
Manager
Experience
7+ years
Team
Data Center - COR
Work setup
On-site

Pay vs market

Employer-posted ranges for Real Estate & Construction roles in IL in the last 12 months (49 postings).

$66k
25th pct/yr
$100k
Median/yr
$155k
75th pct/yr
$49k · 10th90th · $188k

This job: $143k–$210k/yr

Where this pay sits: ••th percentilePro

CoreWeave hiring

Company page
Actively hiringHiring64· FairHardware, Chips & Telecom
Open roles
321
New in 30 days
78
Closed in 30 days
89
Hiring trend, 13 weeksPro
Follow-through: ••%Pro

About the role

From CoreWeave's careers page, checked Nov 22

CoreWeave is The Essential Cloud for AI™. Built for pioneers by pioneers, CoreWeave delivers a platform of technology, tools, and teams that enables innovators to build and scale AI with confidence. Trusted by leading AI labs, startups, and global enterprises, CoreWeave combines superior infrastructure performance with deep technical expertise to accelerate breakthroughs and turn compute into capability. Founded in 2017, CoreWeave became a publicly traded company (Nasdaq: CRWV) in March 2025. Learn more at www.coreweave.com.

What You’ll Do

You will be a key leader within CoreWeave’s Construction Services and Program Management team, driving the successful delivery of hyperscale data center construction projects across our global portfolio.

About the role

As a Senior Data Center Construction Project Manager, you will serve as CoreWeave’s on-site owner’s representative, leading construction projects from pre-construction through close-out. You will oversee general contractors, manage contracts, and ensure projects are delivered in alignment with design specifications, budgets, master schedules, and committed Ready-for-Service (RFS) dates.

You will have a strong focus on the coordination and commissioning of MEP and low-voltage systems and will travel regularly to project sites to validate construction progress, verify work quality, and proactively identify and address schedule, cost, and delivery risks. You will drive projects toward successful completion while providing leadership with regular updates on progress, financials, risks, and overall project status.

Who You Are

  • B.S. or B.A. degree in Construction, Architecture, Engineering, or a related field.
  • A minimum of 7 years of construction project management experience.
  • A minimum of 3 years of direct experience managing data center construction projects with a strong emphasis on MEP (Mechanical, Electrical, Plumbing) systems.
  • Demonstrated experience managing projects with a contract value of $100M+.
  • Deep understanding of data center infrastructure, including power distribution, cooling systems, and redundancy protocols.
  • Knowledge of construction components, processes, methodologies, and cost estimation.
  • Experience with web-based project management software.
  • A valid driver's license with no significant MVA points/violations.
  • Experience conducting on-site progress inspections and verifying contractor work against drawings, specifications, and the master schedule.

Preferred

  • PMP (Project Management Professional) Certification
  • LEED AP (Leadership in Energy and Environmental Design Accredited Professional) Certification
  • Direct experience with electrical and low-voltage equipment coordination, commissioning, or quality assurance.

Wondering if you’re a good fit?

We believe in investing in our people, and value candidates who can bring their own diversified experiences to our teams – even if you aren't a 100% skill or experience match. Here are a few qualities we’ve found compatible with our team. If some of this describes you, we’d love to talk.

  • You love to take ownership and drive complex, technical projects from start to finish.
  • You’re curious about building the critical infrastructure that powers the future of computing.
  • You’re an expert in managing large-scale construction budgets, schedules, and contracts in mission-critical environments.

Why CoreWeave?

At CoreWeave, we work hard, have fun, and move fast! We’re in an exciting stage of hyper-growth that you will not want to miss out on. We’re not afraid of a little chaos, and we’re constantly learning. Our team cares deeply about how we build our product and how we work together, which is represented through our core values:

  • Be Curious at Your Core
  • Act Like an Owner
  • Empower Employees
  • Deliver Best-in-Class Client Experiences
  • Achieve More Together

We support and encourage an entrepreneurial outlook and independent thinking. We foster an environment that encourages collaboration and enables the development of innovative solutions to complex problems. As we get set for takeoff, the organization's growth opportunities are constantly expanding. You will be surrounded by some of the best talent in the industry, who will want to learn from you, too. Come join us!

The base salary range for this role is $143,000 to $210,000. The starting salary will be determined by job-related knowledge, skills, experience, and the market location. We strive for both market alignment and internal equity when determining compensation. In addition to base salary, our total rewards package includes a discretionary bonus, equity awards, and a comprehensive benefits program (all based on eligibility).

What We Offer

In addition to a competitive salary, we offer a variety of benefits to support your needs. The benefits below reflect our US-based offerings for full-time employees; for roles in other locations, benefits vary and are shared during the hiring process. These include:

  • Medical, dental, and vision insurance - 100% paid for by CoreWeave
  • Company-paid Life Insurance
  • Voluntary supplemental life insurance
  • Short and long-term disability insurance
  • Flexible Spending Account
  • Health Savings Account
  • Tuition Reimbursement
  • Ability to Participate in Employee Stock Purchase Program (ESPP)
  • Mental Wellness Benefits through Spring Health
  • Family-Forming support provided by Carrot
  • Paid Parental Leave
  • Flexible, full-service childcare support with Kinside
  • 401(k) with a generous employer match
  • Flexible PTO
  • Catered lunch each day in our office and data center locations
  • A casual work environment
  • A work culture focused on innovative disruption

California Applicants

California Consumer Privacy Act

Equal Opportunity & Accommodations

CoreWeave is an equal opportunity employer, committed to fostering an inclusive and supportive workplace. All qualified applicants and candidates will receive consideration for employment without regard to race, color, religion, sex, disability, age, sexual orientation, gender identity, national origin, veteran status, or genetic information.

As part of this commitment and consistent with the Americans with Disabilities Act (ADA), CoreWeave will ensure that qualified applicants and candidates with disabilities are provided reasonable accommodations for the hiring process, unless such accommodation would cause an undue hardship. If reasonable accommodation is needed, please contact: [email protected].

Export Control Compliance

This position requires access to technology and/or source code subject to U.S. export control laws. Any such access will be provided only in compliance with applicable U.S. export control requirements. As part of the recruitment process, CoreWeave may request limited information reasonably necessary to assess applicable export-control requirements.

Skills mentioned

  • Project Management
  • Contract Management
  • Spring
  • Program Management
  • Compliance
  • Quality Assurance
  • Leadership
Apply on CoreWeave's siteOpens CoreWeave's own application page.

Similar jobs

Same role or field, nearby or remote, ranked by HirQ score.

Project Surveyor

Atwell, LLCLincolnshire, Illinois, United States; Lombard, Illinois, United States; Naperville, Illinois, United States

$37–$47/hr6d agoReposted 1×76· Strong

More at CoreWeave

All roles

Keep exploring

Senior Construction Manager - Data Center Construction

$143k–$210k/yr · HirQ 66

Apply