Skip to content

Planning Engineer | 400 kV+ Transmission Line & Substation Projects | PMC Role

Hudson ManpowerGujarat

First seen Sep 22 · open 65 days · posted onceNo pay listed

HirQ verdict

55/100 · Fair. Based on age, reposts, pay, the company's hiring and ghost signals.

Low ghost risk
True age
65 days
Reposts
Posted once

See the evidence behind this score.

Pro shows each part of the score, the reasons, the pay percentile and the listing history.

HirQ's ghost-risk estimate and company labels are automated opinions based on what we observe on employers' public job boards: how long a listing has been open, whether it was re-listed, wording in the description, and how often roles on that board close. They are not statements about an employer's intent, and a high-risk listing can still be a real opening. Figures are as of the date shown. How we measure

At a glance

Pay
No pay listed
Level
Mid level
Experience
8+ years
Type
Fulltime Permanent
Team
ENGINEERING
Work setup
On-site

Hudson Manpower hiring

Company page
Hiring fastHiring63· FairStaffing & Recruiting
Open roles
185
New in 30 days
79
Closed in 30 days
56
Hiring trend, 13 weeksPro
Follow-through: ••%Pro

About the role

From Hudson Manpower's careers page, checked Nov 27

We are currently hiring experienced Planning Engineers for a permanent PMC (Project Management Consultancy) role with exposure to 400 kV and above Transmission Line and Substation Projects.

Position: Planning Engineer – Transmission Line & Substation Projects

Role: Planning / Project Controls – PMC
Experience: 8–12 Years
Qualification: B.E. / B.Tech in Civil / Electrical Engineering
Employment: Permanent
Project Sector: Power Transmission & Substation
Project Voltage: 400 kV and above

Work Locations

Open positions are available at

  • Kutch, Gujarat
  • Jamnagar, Gujarat
  • Mumbai, Maharashtra
  • Pune, Maharashtra

Important: Candidates must be flexible and willing to work at any of the above locations, depending on project requirements.

Role Purpose

The Planning Engineer will work as a PMC Planning Representative and will be responsible for establishing, reviewing, monitoring, and controlling integrated project schedules for high-voltage transmission line and substation packages.

The role will involve close coordination with contractors, client teams, engineering, procurement, construction, testing and commissioning teams to ensure timely project execution and accurate progress reporting.

Key Responsibilities

  • Act as the PMC planning representative for transmission line and substation packages.
  • Review contractor WBS, baseline schedules, activity logic, durations, calendars, constraints, milestones, and resource loading.
  • Develop and maintain integrated schedules covering:
  • Engineering
  • Procurement
  • Construction
  • Testing
  • Commissioning
  • Energisation
  • Handover
  • Establish and monitor progress measurement methods based on BOQ, Schedule of Values, contractual milestones, and verified site quantities.
  • Prepare and review daily, weekly, monthly, two-week and three-month look-ahead schedules.
  • Prepare and monitor S-curves, resource histograms and milestone trackers.
  • Verify contractor-reported physical progress against actual site records and coordinate with engineering, procurement and construction teams.
  • Monitor critical and near-critical paths and identify delays, slippages and constraints.
  • Recommend corrective actions, recovery schedules and acceleration measures.
  • Track:
  • Drawing approvals
  • Long-lead materials
  • Manufacturing
  • Dispatch
  • Site receipt
  • Work-front readiness
  • Package interfaces
  • Support extension-of-time and delay claim assessments through event chronology, contemporaneous records and schedule-impact analysis.
  • Prepare MIS reports, dashboards, schedule narratives, risk registers and project forecasts.
  • Present planning updates and key project issues during management/project review meetings.
  • Coordinate with multiple stakeholders to ensure timely completion of project milestones.

Required Project Experience

Candidates must have hands-on planning/project-controls experience in

  • 400 kV and above Transmission Line Projects
  • 400 kV and above AIS/GIS Substation Projects
  • High-voltage power transmission projects
  • Substation civil, structural, electrical and commissioning activities

Preference will be given to candidates with experience in PMC, Owner’s Engineer, Client-side or EPC project environments.

Technical Skills Required

Strong working knowledge of

  • Primavera P6
  • MS Project
  • Advanced MS Excel
  • Schedule development and baselining
  • Critical Path Method (CPM)
  • Progress measurement and monitoring
  • Resource planning
  • S-Curve preparation
  • Delay analysis
  • Recovery/acceleration planning
  • Procurement monitoring
  • Risk and constraint tracking
  • MIS and management reporting

Preferred Candidate Profile

The ideal candidate should have 8–12 years of proven planning and project-controls experience in high-voltage transmission line and substation projects.

The candidate should be capable of independently

  • Reviewing and challenging contractor schedules
  • Validating baseline programmes
  • Reconciling reported progress with actual site progress
  • Identifying critical and emerging delays
  • Preparing recovery plans
  • Monitoring procurement and construction interfaces
  • Forecasting project completion
  • Preparing accurate MIS and management reports
  • Coordinating with contractors, clients and multiple project stakeholders

Skills mentioned

  • Procurement
  • Excel
  • Project Management
  • Forecasting
  • Electrical Engineering
  • Manufacturing
Apply on Hudson Manpower's siteOpens Hudson Manpower's own application page.

Similar jobs

Same role or field, nearby or remote, ranked by HirQ score.

More at Hudson Manpower

All roles

Keep exploring

Planning Engineer | 400 kV+ Transmission Line & Substation Projects | PMC Role

No pay listed · HirQ 55

Apply