Skip to content

Wastewater Treatment Project Manager (Data Center Construction) – Texas

WwprosolutionsVernon, TX

First seen Apr 23 · open 215 days · posted onceNo pay listed

HirQ verdict

49/100 · Weak. Based on age, reposts, pay, the company's hiring and ghost signals.

Medium ghost risk
True age
215 days
Reposts
Posted once

See the evidence behind this score.

Pro shows each part of the score, the reasons, the pay percentile and the listing history.

HirQ's ghost-risk estimate and company labels are automated opinions based on what we observe on employers' public job boards: how long a listing has been open, whether it was re-listed, wording in the description, and how often roles on that board close. They are not statements about an employer's intent, and a high-risk listing can still be a real opening. Figures are as of the date shown. How we measure

At a glance

Pay
No pay listed
Level
Mid level
Experience
5+ years
Type
Full Time
Team
Project Management
Work setup
On-site

“Vernon, TX”

Pay vs market

Employer-posted ranges for Project & Program Management roles in TX in the last 12 months (86 postings).

$105k
25th pct/yr
$130k
Median/yr
$175k
75th pct/yr
$82k · 10th90th · $206k

This job: No pay listed

Wwprosolutions hiring

Company page
Hiring fastHiring62· FairManufacturing & Industrial
Open roles
58
New in 30 days
19
Closed in 30 days
2
Hiring trend, 13 weeksPro
Follow-through: ••%Pro

About the role

From Wwprosolutions's careers page, checked Nov 24

WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.

About the Role
WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization focused on delivering high-impact construction execution through lean practices, collaborative delivery, and performance-driven outcomes.
We are hiring a Wastewater Treatment Project Manager to support multiple hyperscale data center projects across North Texas. This role sits within our owner’s representative construction management team, overseeing critical process utility infrastructure tied to water and wastewater systems.
This is a full-time, long-term position with WWPS, not a contract or staff augmentation role. You will be embedded in major mission critical builds with continuity across projects, full benefits, and long-term career stability.
We are actively hiring for immediate project needs across multiple Texas sites and are structured to support both traveling and relocating candidates. Per-dem and travel packages are available, and we also offer relocation assistance for candidates seeking long-term placement.
This is an opportunity to step into a stable, long-term role with consistent project continuity, rather than short-term contract work. If you are looking for sustained engagement on large-scale, mission critical builds with a clear path forward, this role is built for that.
Role Overview
The Wastewater Treatment Project Manager is responsible for planning, coordinating, and overseeing the installation, commissioning, and turnover of water and wastewater infrastructure systems supporting hyperscale data center operations.
This role ensures systems are delivered on schedule, fully compliant, and aligned with mission critical performance standards, including reliability, maintainability, and environmental compliance.
You will operate in a fast-paced, zero downtime tolerance environment where execution quality and schedule adherence are critical to overall project success.
Key Responsibilities – Process Utility Systems (Water / Wastewater)
Serve as the owner’s representative discipline lead for wastewater and water infrastructure systems across multiple active data center sites
Oversee installation and execution of: Wastewater treatment systems, Industrial water handling and discharge systems, Cooling water support infrastructure as applicable
Validate contractor scope, installation methods, and system compliance with approved drawings and specifications
Lead coordination between contractors, design teams, and client stakeholders to resolve field issues quickly and effectively
Drive design reviews, RFIs, submittals, and field clarifications related to process utility systems
Perform regular site walkdowns to verify installation quality, identify deviations, and enforce construction standards
Support QA/QC execution including inspection plans, testing procedures, and system validation
Participate in commissioning, turnover, and startup activities to ensure systems meet operational readiness requirements
Maintain accurate documentation including issue tracking, test records, and progress reporting
Contribute to a commissioning-driven culture with strong focus on system performance and reliability
Mentor junior staff and reinforce best practices across project teams
Requirements
5 to 8 years of construction experience in one or more of the following: Data centers, Industrial water or wastewater systems, Advanced manufacturing, Oil and gas or heavy industrial environments
Experience supporting process utility systems, water infrastructure, or industrial piping systems
Strong understanding of construction execution, sequencing, and coordination in complex environments
Ability to operate in schedule-critical, fast-paced project environments
Working knowledge of applicable codes and standards related to water and wastewater systems
Proficiency with Microsoft Office and standard construction documentation platforms
Preferred Experience
Experience on hyperscale or mission critical projects
Exposure to commissioning and startup of utility systems
Familiarity with owner’s representative or client-side project delivery models
OSHA 30 or equivalent safety certification
Experience working across multiple sites or large-scale programs
Education
Bachelor’s degree in Construction Management, Engineering, or related field preferred
Equivalent field experience will be considered
What Sets This Role Apart
Full-time employment with WWPS. Not a contract role
Long-term project pipeline across multiple hyperscale data center builds
Opportunity to work within an owner’s representative structure, influencing outcomes rather than just executing scope
Exposure to large-scale, technically complex, mission critical infrastructure
Competitive compensation, full benefits, and career progression
Equal Opportunity
World Wide Professional Solutions provides equal employment opportunities to all employees and applicants and prohibits discrimination and harassment of any type in accordance with applicable laws.

Skills mentioned

  • Quality Assurance
Apply on Wwprosolutions's siteOpens Wwprosolutions's own application page.

Similar jobs

Same role or field, nearby or remote, ranked by HirQ score.

More at Wwprosolutions

All roles

Keep exploring

Wastewater Treatment Project Manager (Data Center Construction) – Texas

No pay listed · HirQ 49

Apply