Skip to content

Wastewater Construction Manager (Data Center Construction) – Texas

WwprosolutionsVernon, TX

First seen Apr 23 · open 213 days · posted onceNo pay listed

HirQ verdict

49/100 · Weak. Based on age, reposts, pay, the company's hiring and ghost signals.

Medium ghost risk
True age
213 days
Reposts
Posted once

See the evidence behind this score.

Pro shows each part of the score, the reasons, the pay percentile and the listing history.

HirQ's ghost-risk estimate and company labels are automated opinions based on what we observe on employers' public job boards: how long a listing has been open, whether it was re-listed, wording in the description, and how often roles on that board close. They are not statements about an employer's intent, and a high-risk listing can still be a real opening. Figures are as of the date shown. How we measure

At a glance

Pay
No pay listed
Level
Manager
Type
Full Time
Team
Field Execution
Work setup
On-site

“Vernon, TX”

Pay vs market

Employer-posted ranges for Real Estate & Construction roles in TX in the last 12 months (73 postings).

$65k
25th pct/yr
$110k
Median/yr
$151k
75th pct/yr
$43k · 10th90th · $182k

This job: No pay listed

Wwprosolutions hiring

Company page
Hiring fastHiring63· FairManufacturing & Industrial
Open roles
58
New in 30 days
19
Closed in 30 days
2
Hiring trend, 13 weeksPro
Follow-through: ••%Pro

About the role

From Wwprosolutions's careers page, checked Nov 23

WORLD WIDE PROFESSIONAL SOLUTIONS is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.

About the Role
WORLD WIDE PROFESSIONAL SOLUTIONS is hiring a Wastewater Construction Manager to support hyperscale data center builds across North Texas.
This role sits within the owner’s representative construction management team and is focused on field execution, installation oversight, and delivery of water and wastewater systems supporting mission critical facilities.
This is a full-time, long-term position with continuity across multiple projects. You will be embedded in active builds, driving execution quality, schedule adherence, and system readiness in a zero downtime environment.
Role Overview
The Wastewater Construction Manager is responsible for on-site construction execution and coordination of wastewater and water infrastructure systems.
This is a field leadership role, ensuring systems are installed correctly, safely, and in alignment with design, schedule, and commissioning requirements.
You will work closely with contractors, trades, engineers, and client stakeholders to drive installation progress, resolve field issues, and support turnover readiness.
Key Responsibilities – Construction Execution (Water / Wastewater)
Act as the owner’s representative field lead for wastewater and water systems

Oversee daily construction activities and installation of

Wastewater treatment systems
Industrial water handling and discharge systems
Process piping and utility infrastructure
Monitor contractor performance, manpower, and sequencing to maintain schedule
Perform regular site walkdowns to verify installation quality and identify issues early
Enforce compliance with drawings, specifications, and construction standards
Coordinate across trades to resolve clashes, access constraints, and install conflicts
Drive execution of RFIs, submittals, and field clarifications
Support QA/QC including inspections, testing, and punchlist management
Partner with commissioning teams for startup, flushing, testing, and turnover
Track progress, maintain documentation, and report field issues
Promote a safety-first, high accountability jobsite culture
Mentor junior staff and reinforce field best practices
Requirements
5 to 10 years of construction management or field supervision experience in:
Data centers
Industrial water or wastewater systems
Advanced manufacturing
Oil and gas or heavy industrial environments
Strong background in field execution, sequencing, and trade coordination
Experience with process piping, utility systems, or industrial infrastructure
Ability to operate in fast-paced, schedule-driven environments
Working knowledge of water and wastewater codes and standards
Proficiency with construction documentation and reporting tools
Preferred Experience
Hyperscale data center or mission critical project experience
Exposure to commissioning, startup, and turnover
Experience in an owner’s representative environment
OSHA 30 or equivalent certification
Multi-site or large program experience
Education
Bachelor’s degree in Construction Management, Engineering, or related field preferred
Equivalent field experience will be considered
What Sets This Role Apart
Full-time role with WWPS. Not a contract
Long-term pipeline across multiple hyperscale data center builds
Field-focused position with direct impact on execution and delivery
Exposure to large-scale, technically complex infrastructure
Competitive compensation, full benefits, and career growth

Skills mentioned

  • Quality Assurance
Apply on Wwprosolutions's siteOpens Wwprosolutions's own application page.

Similar jobs

Same role or field, nearby or remote, ranked by HirQ score.

More at Wwprosolutions

All roles

Keep exploring

Wastewater Construction Manager (Data Center Construction) – Texas

No pay listed · HirQ 49

Apply